Gardiner Expressway
Information about Gardiner Expressway
| Gardiner Expressway | |
| Frederick G. Gardiner Expressway | |
| Formed: | 1955 - completed |
|---|---|
| Direction: | East/West Map |
| From: | Toronto, Ontario |
| To: | Toronto, Ontario |
| Major cities: | Toronto, Ontario |
A trailblazer for the Gardiner Expressway on Yonge Street.
The Gardiner Expressway, along with the Don Valley Parkway and the Allen Road (the short completed section of the truncated Spadina Expressway), form the municipal expressway system in Toronto. These are the expressways which are owned and operated by the City of Toronto. The remainder of the highways operating within the city's boundaries—Highways 401, 427, 400, 409, 404, and the Queen Elizabeth Way—are 400-Series Highways, which are owned and operated by the Ministry of Transportation.
It is named for the first chair of the now-defunct Metro Council, Frederick G. Gardiner, who championed the project and was responsible for the building of the Don Valley Parkway.
Construction
The Gardiner Expressway was one of the first projects undertaken by the newly formed government of Metro Toronto. Plans for the highway, first named the Lakeshore Expressway were first developed in 1943, prior to the formation of Metro Toronto.Construction on the expressway began in 1955. The Gardiner was built in segments, with the final section being completed in 1966. The price tag was approximately $110 million Canadian or approximately $700 million in 2006 dollars.
Segments
- Humber River to Jameson Avenue was completed in 1958.
- Jameson Avenue to York Street was completed in 1962.
- York Street to Don Valley Parkway was completed in 1964.
- Don Valley Parkway to Leslie Street was completed in 1966 (now demolished).
Route Construction
The route of the Expressway, from a planning point of view was problematic and controversial. It necessitated the paving over of parkland, demolition of a popular amusement park, residential demolition and a long elevated section to get through the downtown area.The original route of the Expressway called for the demolition of historic Fort York. Community groups fought hard and eventually won to save the fort over the wishes of Mr. Gardiner. The freeway was re-routed to the south of the grounds and this happens to also be the highest point of the elevated section.
The route of the Expressway around Humber Bay necessitated the demolition of the Sunnyside Amusement Park on the lakeshore, which had existed since 1925. Some amusements were moved to the CNE, others sold off or just destroyed. The carousel was moved to the newly built Disneyland. In that area, Lakeshore Boulevard was also expanded to a six-lane road and The Queensway was built. Only the Sunnyside Pool and Palais Royale hall now exist from that time period. A pedestrian bridge crossing was built from the foot of Roncesvalles Avenue to the Palais Royale site.
A residential neighbourhood was demolished at the foot of Jameson Avenue, to the west of the CNE. The building of the interchange for Jameson Avenue created a barrier to the lakeshore, necessitating a pedestrian bridge over Lakeshore Boulevard. Subsequent efforts by local residents to have the expressway utilize a tunnel in that area have not come to fruition. The building of the expressway in that area has led directly to a decline in the Parkdale neighbourhood, causing a concrete jungle along Jameson Avenue, where previously there had been mansions.
East of Fort York, the Gardiner was built through a predominantly industrial area, to the south of railway lands to get to the downtown. This section is entirely elevated. The area around this elevated section has changed greatly from industrial to residential and commercial as land values have increased. The railway lands have been largely redeveloped, with industrial use much reduced.
Elevated Section Design
The elevated section is constructed higher than required to cross city streets since it was found that such a design would take the traffic noise away from ground level.One section, at approximately Strachan Avenue, is significantly wider. This was intended to eventually connected with a Highway 400 extension from the north, which has never been needed.
Scarborough Expressway extension
East of the Don River, an elevated section was built to Leslie Street. This was to be part of a planned expressway through the Beach district of the City at the time and the eastern suburb of Scarborough, to eventually connect with Highway 401 via Highway 2A. This highway, known as the Scarborough Expressway was never completed due to public opposition.The built elevated section was demolished in 2001 due to the high maintenance costs associated with the elevated roadway. The only remnant kept were some of the pillars just west of Leslie that were turned into a public art project. Eastbound traffic now exits to a newly constructed offramp that connects with Lakeshore Blvd. East, just east of Carlaw Avenue.
Municipal downloading
Subsequent to the 1998 amalgamation of the Metro municipalities into a single Toronto government, the stretch of the Queen Elizabeth Way between Highway 427 and the Humber River was downloaded from the provincial Ministry of Transportation to the new City of Toronto and was redesignated as part of the Gardiner.Due to its status as a former Ontario 400-series highway, and because of its more recent design (rebuilt in the late 1960s), this section was built to higher standards than the Metro-constructed Gardiner. A system of collector and express lanes serve Kipling Avenue and Islington Avenue and this segment has a speed limit of 100 km/h rather than 90 km/h.
Since the end of 2003, the conventional truss lighting poles that the province installed in the late 1960s have been replaced west of Kipling Avenue and east of Royal York Road, in favour of shaded high-mast lighting like that of the Don Valley Parkway.
Present
The Gardiner, along with the Don Valley Parkway and Allen Road, were fitted with the distinct cobra-neck 30 foot poles. They were first fitted with florescent tubes in the 1960s, which was changed to the orange low-pressure sodium (LPS) in 1978. (A 1960s experiment of installing lights on the elevated Gardiner's parapets was quickly shelved.) In the late 1990s, most of the cobra-neck conventional poles were replaced in favour of shaded high-mast lighting, with high-pressure sodium lamps (HPS); however the elevated Gardiner still retained the LPS cobra-neck poles for seven more years. The remaining LPS lamps, which were no longer being produced, were entirely replaced by HPS in early 2006.The old Gardiner and Lakeshore bridges over the Humber River, which had been in service since 1954, were removed and replaced by new structures in 1999. The old bridge pillars had sunken slightly, giving the eastbound Gardiner a roller-coasted ride or "Humber hump".
The elevated section in downtown Toronto was closed down for extensive repairs in the late 1990s; parallel roads such as Lake Shore Boulevard and Front Street were extensively congested until the Gardiner reopened.
In the wake of the eastern demolition, Lake Shore Boulevard East has been revealed from the cover of the highway. Green boulevards have been implemented along the wide thoroughfare. Paved bicycle paths extend eastward for approximately two kilometres from the Martin Goodman Trail at Cherry Street to Coxwell Avenue. A local artist has created a commemorative piece for the demolished elevated expressway out of several of its giant supportive concrete pillars. However, critics pointed out that the demolition cost was underestimated and it ended up costing as much as the alternative repair solution. As a result, there was a lack of funds to beautify Lake Shore East.
Even though the suburban population and the number of jobs in the city core have grown significantly, the capacity of the Gardiner has not increased since it opened in the 1960s and no alternate routes to the Gardiner have been constructed. Historical traffic and transit data indicate that TTC ridership entering downtown have remained relatively stable or declined since the 1980s while car ownership has continued to climb. GO Transit ridership has grown but it failed to relieve the congestion problem, particularly for suburban residents commuting to jobs downtown. As a result, the Gardiner is one of the busiest freeways in the Toronto area, along with the Don Valley Parkway.
As one of the few express routes for motor traffic into the downtown core, the Gardiner is regarded by many as essential to the city's economy, in wake of stiff competition from lower business-tax neighbours like Peel Region and York Region which have more extensive provincial freeway networks. Nonetheless, the elevated section's presence remains one of the more contentious urban planning issues in Toronto. Critics of the expressway have long decried its appearance, referring to it as "The Mistake by the Lake", and have argued that it cuts off the city from its waterfront.
An overhead view of the Gardiner Expressway (right) from the CN Tower
Ending up, city council voted to have the elevated section extensively rehabilitated. Supporters of the elevated Gardiner point out that its design (in particular being constructed higher than required to cross city streets) keeps traffic noise away from ground level. They also note that even if it were removed, the waterfront view would still be obstructed by railroad tracks whose central portion is raised upon a high embankment. In addition, there is growing concern about the new condos, many of which have sprung up in formerly empty land since 2000 and obscure the waterfront.
Alternative Proposals
One proposal in favour of maintaining the elevated section suggested beautifying the land below the Gardiner.In recent decades, several proposals have been made to dismantle it or replace its central section with a tunnel. One recent tunnel proposal was part of a wide-ranging report presented by the Toronto Waterfront Revitalization Task Force in 1999. Lack of municipal funds and political will have repeatedly stalled such plans. The demolition of the elevated Gardiner was estimated at $750 million. The 1999 tunnel would have not only cost $2-3 billion but also require a toll for several years to help recoup the costs and it has drawn unfavourable comparisons to Boston's Big Dig. All three projects require the completion of the $245 million Front Street extension as a prerequisite.
An overview of the planned changes to the Gardiner as proposed by the Task Force:
- retain elevated portions from west of Dufferin Street to Spadina Avenue
- add new on/off ramps to connect with Front Street extension
- replace elevated portion from Spadina Avenue to Simcoe Street with 2 five lane roadway (Lakeshore Blvd) separated by landscaped median
- replace elevated portion from Simcoe Street to Jarvis Street with 2 five lane roadway (Lakeshore Blvd) separated by city block
- replace elevated portion from Jarvis Street to Don River with 2 four lane roadway (Lakeshore Blvd) separated by landscaped median
- relocated Don River channel and re-build new ramps onto the Don Valley Parkway with surface roadway (Lakeshore Blvd)
Replacing the elevated Gardiner with an expanded arterial has met with heavy opposition. The combined capacity of the existing Gardiner and Lakeshore is twelve lanes, while the new proposal would have reduced it to ten. The need for traffic lights would also cause more congestion. Others point out that the ten lane boulevard is less pedestrian friendly to cross, as one could simply walk under the elevated Gardiner.
A different proposal, named the Toronto Waterfront Viaduct, calls for the replacement of the existing elevated expressway with an 8 to 10-lane cable-stayed viaduct over the Lake shore rail corridor. This proposal rescues the original idea of building the highway over this rail corridor, but also combining the new expressway with a new Lake shore light rail transit system, and areas for bicycle and pedestrian traffic. The advantage of cable-stayed technology, is that it allows for construction in cantilever, minimizing disruption of traffic below during its construction period. Also, the replacement of the existing elevated highway with a structure on a parallel corridor, allows for the current expressway to remain in business, while construction of the new viaduct takes place. The website: www.toviaduct.com explains this innovative proposal in more detail.
Objects falling onto the Gardiner Expressway
Ice from the CN Tower
On March 5, 2007, a section of the Gardiner Expressway was closed between Spadina Avenue and Jarvis Street due to the threat of ice about the size of a kitchen table falling from the CN tower. Several days before, a storm with snow and freezing rain had caused a great deal of ice to accrete on the tower. As the weather warmed and the sun heated the tower's concrete, large pieces of ice began falling off the tower and falling hundreds of metres to the ground below. Although nobody was injured, the Gardiner was closed as a precautionary measure. On March 6, cooler weather reduced the risk of falling ice, and prevailing wind conditions had changed reducing the risks of ice falling onto the highway; the road was reopened subsequently.Concrete from the Kipling Avenue bridge
On May 3, 2007 at around 7:00 a.m., a chunk of concrete about the size of a loaf of bread fell from the Kipling Avenue bridge onto the Gardiner Expressway. It missed cars and caused no damage, bouncing harmlessly away despite the morning rush hour traffic. City crews were quickly sent to close off lanes of traffic to begin an inspection of the structure, which is a late 1960s post-tensioned design built by the province while it was still part of the QEW. This incident raised fears about safety of the highway, particularly with memories of the recent overpass collapse in Laval, Quebec, still fresh in the minds of motorists and media.
Lane configurations from East to West
| Section | Travel Lanes |
|---|---|
| Don Valley Parkway & Lake Shore Boulevard Ramps | 2 Lanes in Each Direction |
| Don Valley Parkway/Lake Shore Boulevard - Parliament St | 4 Lanes in Each Direction |
| Parliament St - Sherbourne St | 3 Lanes Eastbound - 4 Lanes Westbound |
Exit list
Exits were numbered from west to east on the former Queen Elizabeth Way section.| Old # | Destinations | Notes |
|---|---|---|
| Westbound exit and eastbound entrance | ||
| 139 | Westbound exit and eastbound entrance | |
| 141 | Kipling Avenue | |
| 142 | Islington Avenue | Signed as exits 142A (south) and 142B (north) |
| 144 | Park Lawn Road | Eastbound exit and westbound entrance |
| 145 | Lake Shore Boulevard | Westbound exit and eastbound entrance; former Hwy 2 west |
| Lake Shore Boulevard | Eastbound exit and westbound entrance | |
| South Kingsway | Westbound exit and eastbound entrance | |
| Jameson Avenue, Dunn Avenue - Rogers Centre | ||
| Spadina Avenue, Lake Shore Boulevard | ||
| York Street, Bay Street, Yonge Street - Toronto Island, Harbourfront | Former Hwy 11 (Yonge Street) and Hwy 11A (York Street) | |
| Jarvis Street, Sherbourne Street - Rogers Centre | ||
| Don Valley Parkway | Eastbound exit and westbound entrance | |
| Lake Shore Boulevard | Eastbound exit and westbound entrance; former Hwy 2 east |
Call boxes
Call boxes (for emergency assistance for stranded motorists) fixed to poles on the shoulders were removed along the Gardiner, as was the case on the Don Valley Parkway.References
- Fulford, Robert. "Fred Gardiner's Specialized City", in Accidental City: The transformation of Toronto (1995). Toronto: Macfarlane Walter & Ross.
See also
External links
- Photos of the Gardiner East demolition from the City of Toronto Archives
- www.toviaduct.com - The Toronto Waterfront Viaduct proposal to replace the Gardiner Expressway.
- Missing Links, A Complete History Of Toronto's Controversial Expressway System
- City of Toronto RESCU Traffic Cameras (also includes traffic cameras for the Don Valley Parkway and Lake Shore Boulevard)
- Technical Briefing report of the future of the Gardiner Expressway by TWRC, Simplified Version
- Google Maps of Gardiner Expressway
City of Toronto
Flag
Coat of arms
Nickname: T.O., Hogtown, The Big Smoke, T-Dot, Toronto the Good
Motto: Diversity Our Strength
..... Click the link for more information.
Flag
Coat of arms
Nickname: T.O., Hogtown, The Big Smoke, T-Dot, Toronto the Good
Motto: Diversity Our Strength
..... Click the link for more information.
City of Toronto
Flag
Coat of arms
Nickname: T.O., Hogtown, The Big Smoke, T-Dot, Toronto the Good
Motto: Diversity Our Strength
..... Click the link for more information.
Flag
Coat of arms
Nickname: T.O., Hogtown, The Big Smoke, T-Dot, Toronto the Good
Motto: Diversity Our Strength
..... Click the link for more information.
City of Toronto
Flag
Coat of arms
Nickname: T.O., Hogtown, The Big Smoke, T-Dot, Toronto the Good
Motto: Diversity Our Strength
..... Click the link for more information.
Flag
Coat of arms
Nickname: T.O., Hogtown, The Big Smoke, T-Dot, Toronto the Good
Motto: Diversity Our Strength
..... Click the link for more information.
freeway — also known as a highway, superhighway, autoroute, autobahn, autopista, autovía, autostrada, dual carriageway, expressway, or motorway — is a type of road designed for safer high-speed operation of motor vehicles through the elimination of at-grade
..... Click the link for more information.
..... Click the link for more information.
City of Toronto
Flag
Coat of arms
Nickname: T.O., Hogtown, The Big Smoke, T-Dot, Toronto the Good
Motto: Diversity Our Strength
..... Click the link for more information.
Flag
Coat of arms
Nickname: T.O., Hogtown, The Big Smoke, T-Dot, Toronto the Good
Motto: Diversity Our Strength
..... Click the link for more information.
Ontario
Flag Coat of arms
Motto: Ut Incepit Fidelis Sic Permanet (Latin: Loyal she began, loyal she remains)
Capital Toronto
Largest city Toronto
Official languages English (de facto)
Government
..... Click the link for more information.
Flag Coat of arms
Motto: Ut Incepit Fidelis Sic Permanet (Latin: Loyal she began, loyal she remains)
Capital Toronto
Largest city Toronto
Official languages English (de facto)
Government
..... Click the link for more information.
This page is currently protected from editing until disputes have been resolved.
Protection is not an endorsement of the current [ version] ([ protection log]).
..... Click the link for more information.
Protection is not an endorsement of the current [ version] ([ protection log]).
..... Click the link for more information.
Coordinates
Primary sources Niagara River
..... Click the link for more information.
Primary sources Niagara River
..... Click the link for more information.
Highway 427
1972
QEW in Toronto
RR 7 in Vaughan
Ontario provincial highways
< Hwy 420
400-series
Highway 427
..... Click the link for more information.
1972
QEW in Toronto
RR 7 in Vaughan
Ontario provincial highways
< Hwy 420
400-series
Highway 427
..... Click the link for more information.
Queen Elizabeth Way
1936-39
I-190 in Buffalo, NY
Hwy 405 near Niagara Falls
Hwy 406 in St. Catharines
Burlington St. in Hamilton
Hwy 403/Hwy 407 in Burlington
Hwy 427/Gardiner in Toronto
Ontario provincial highways
..... Click the link for more information.
1936-39
I-190 in Buffalo, NY
Hwy 405 near Niagara Falls
Hwy 406 in St. Catharines
Burlington St. in Hamilton
Hwy 403/Hwy 407 in Burlington
Hwy 427/Gardiner in Toronto
Ontario provincial highways
..... Click the link for more information.
Don Valley Parkway
DVP
1960s - completed 1966
North/South Map
Gardiner Expressway, Toronto, Ontario
Highway 401 & Highway 404, Toronto, Ontario
Toronto, Ontario
The Don Valley Parkway (generally referred to as the "
..... Click the link for more information.
DVP
1960s - completed 1966
North/South Map
Gardiner Expressway, Toronto, Ontario
Highway 401 & Highway 404, Toronto, Ontario
Toronto, Ontario
The Don Valley Parkway (generally referred to as the "
..... Click the link for more information.
Don River is one of two rivers bounding the original settled area of Toronto, Canada along the shore of Lake Ontario, the other being the Humber River to the west. The Don is formed from two rivers, the East and West Branches, that meet about 7 km north of Lake Ontario while
..... Click the link for more information.
..... Click the link for more information.
Allen Road
W.R. Allen Road
1960s - partially completed
North/South
Eglinton Avenue, Toronto, Ontario
Sheppard Avenue, Toronto, Ontario
Toronto, Ontario
William R.
..... Click the link for more information.
W.R. Allen Road
1960s - partially completed
North/South
Eglinton Avenue, Toronto, Ontario
Sheppard Avenue, Toronto, Ontario
Toronto, Ontario
William R.
..... Click the link for more information.
Spadina Expressway
partially completed/cancelled
North/South
North York, Ontario
Toronto, Ontario
North York, Ontario, York, Ontario Toronto, Ontario
The Spadina Expressway
..... Click the link for more information.
partially completed/cancelled
North/South
North York, Ontario
Toronto, Ontario
North York, Ontario, York, Ontario Toronto, Ontario
The Spadina Expressway
..... Click the link for more information.
Highway 401
Macdonald-Cartier Freeway, Highway of Heroes
825.1 km[1] (0 mi)
1938 (parts as Highway 2A),
1947 (numbered in 1952)[2]
Hwy 3 in Windsor
Hwy 402 in London
Hwy 8 in Kitchener
Hwy 427 in Toronto
..... Click the link for more information.
Macdonald-Cartier Freeway, Highway of Heroes
825.1 km[1] (0 mi)
1938 (parts as Highway 2A),
1947 (numbered in 1952)[2]
Hwy 3 in Windsor
Hwy 402 in London
Hwy 8 in Kitchener
Hwy 427 in Toronto
..... Click the link for more information.
Highway 427
1972
QEW in Toronto
RR 7 in Vaughan
Ontario provincial highways
< Hwy 420
400-series
Highway 427
..... Click the link for more information.
1972
QEW in Toronto
RR 7 in Vaughan
Ontario provincial highways
< Hwy 420
400-series
Highway 427
..... Click the link for more information.
Highway 400
1951 (numbered in 1952)
Black Creek Dr in Toronto
Hwy 401 in Toronto
Hwy 11 near Barrie
Hwy 69 near Parry Sound
Ontario provincial highways
< Hwy 148
400-series
The King's Highway 400
..... Click the link for more information.
1951 (numbered in 1952)
Black Creek Dr in Toronto
Hwy 401 in Toronto
Hwy 11 near Barrie
Hwy 69 near Parry Sound
Ontario provincial highways
< Hwy 148
400-series
The King's Highway 400
..... Click the link for more information.
Highway 409
Belfield Expressway
1975
Pearson Airport
Hwy 401 in Toronto
Ontario provincial highways
< Hwy 407
400-series
Highway 409
..... Click the link for more information.
Belfield Expressway
1975
Pearson Airport
Hwy 401 in Toronto
Ontario provincial highways
< Hwy 407
400-series
Highway 409
..... Click the link for more information.
Highway 404
1977
Hwy 401/DVP in Toronto
RR 19 near Newmarket
Ontario provincial highways
< Hwy 403
400-series
Highway 404 is a 400-Series Highway in Ontario, Canada.
..... Click the link for more information.
1977
Hwy 401/DVP in Toronto
RR 19 near Newmarket
Ontario provincial highways
< Hwy 403
400-series
Highway 404 is a 400-Series Highway in Ontario, Canada.
..... Click the link for more information.
Queen Elizabeth Way
1936-39
I-190 in Buffalo, NY
Hwy 405 near Niagara Falls
Hwy 406 in St. Catharines
Burlington St. in Hamilton
Hwy 403/Hwy 407 in Burlington
Hwy 427/Gardiner in Toronto
Ontario provincial highways
..... Click the link for more information.
1936-39
I-190 in Buffalo, NY
Hwy 405 near Niagara Falls
Hwy 406 in St. Catharines
Burlington St. in Hamilton
Hwy 403/Hwy 407 in Burlington
Hwy 427/Gardiner in Toronto
Ontario provincial highways
..... Click the link for more information.
400-series highways are a network of controlled-access freeways throughout the southern portion of the province of Ontario, Canada, forming a special subset of the provincial highway system.
..... Click the link for more information.
..... Click the link for more information.
Ministry of Transportation of Ontario (MTO) is an Ontario government ministry responsible for transport infrastructure and law in the Canadian province of Ontario.
..... Click the link for more information.
Role and responsibilities
The ministry is responsible for:- 9.7 million registered vehicles
- 8.
..... Click the link for more information.
Municipality of Metropolitan Toronto was the senior level of municipal government in the Toronto, Ontario, Canada, area from 1954 to 1997. It was a precursor to the later regional municipality, being formed of smaller municipalities but having more responsibilities than a county or
..... Click the link for more information.
..... Click the link for more information.
Frederick Goldwin Gardiner (21 January 1895 – 22 August 1983) was the first chairman of Metropolitan Toronto council, the governing body for the Municipality of Metropolitan Toronto, from 1953 to 1961.
..... Click the link for more information.
..... Click the link for more information.
Municipality of Metropolitan Toronto was the senior level of municipal government in the Toronto, Ontario, Canada, area from 1954 to 1997. It was a precursor to the later regional municipality, being formed of smaller municipalities but having more responsibilities than a county or
..... Click the link for more information.
..... Click the link for more information.
Humber River is one of two major rivers on either side of Toronto, Ontario, Canada, the other being the Don River to the east. It was designated a Canadian Heritage River on September 24, 1999.
..... Click the link for more information.
..... Click the link for more information.
Don Valley Parkway
DVP
1960s - completed 1966
North/South Map
Gardiner Expressway, Toronto, Ontario
Highway 401 & Highway 404, Toronto, Ontario
Toronto, Ontario
The Don Valley Parkway (generally referred to as the "
..... Click the link for more information.
DVP
1960s - completed 1966
North/South Map
Gardiner Expressway, Toronto, Ontario
Highway 401 & Highway 404, Toronto, Ontario
Toronto, Ontario
The Don Valley Parkway (generally referred to as the "
..... Click the link for more information.
Don Valley Parkway
DVP
1960s - completed 1966
North/South Map
Gardiner Expressway, Toronto, Ontario
Highway 401 & Highway 404, Toronto, Ontario
Toronto, Ontario
The Don Valley Parkway (generally referred to as the "
..... Click the link for more information.
DVP
1960s - completed 1966
North/South Map
Gardiner Expressway, Toronto, Ontario
Highway 401 & Highway 404, Toronto, Ontario
Toronto, Ontario
The Don Valley Parkway (generally referred to as the "
..... Click the link for more information.
Leslie Street is a north-south route in Toronto and York Region, Ontario, Canada. It is distinctive because of its four unconnected segments.
In Toronto, it begins at Lake Ontario at the foot of the Leslie Street Spit, so named because this is the most southerly point of
..... Click the link for more information.
In Toronto, it begins at Lake Ontario at the foot of the Leslie Street Spit, so named because this is the most southerly point of
..... Click the link for more information.
Fort York National Historic Site is a historic site of military fortifications and related buildings on the west side of downtown Toronto, Ontario, Canada. The fort was built by the British Army and Canadian militia troops in the late eighteenth and early nineteenth centuries, to
..... Click the link for more information.
..... Click the link for more information.
This article is copied from an article on Wikipedia.org - the free encyclopedia created and edited by online user community. The text was not checked or edited by anyone on our staff. Although the vast majority of the wikipedia encyclopedia articles provide accurate and timely information please do not assume the accuracy of any particular article. This article is distributed under the terms of GNU Free Documentation License.